Acquisition deep dive
LSA · Electric · 2 seats · 92 kt cruise · market ≈ $185,000 (trend +3%/yr)
Defaults compiled from the manuals and owner surveys. Change anything — everything recomputes.
Annual budget
$37,286
Monthly budget (16.67 hrs)
$3,107
Total hourly cost
$186.43/hr
| Line | Annual | Per hour | % |
|---|---|---|---|
| Annual variable | |||
| Fuel | $0 | $0 | 0% |
| Airframe Maintenance | $1,600 | $8 | 4.29% |
| Engine / APU Maintenance | $0 | $0 | 0% |
| Consumables & Misc | $1,600 | $8 | 4.29% |
| Unscheduled / Aging Reserve | $800 | $4 | 2.15% |
| Total variable | $4,000 | $20 | 10.73% |
| Annual fixed | |||
| Hangar | $4,500 | $22.5 | 12.07% |
| Insurance | $2,200 | $11 | 5.9% |
| Aircraft Misc & Subscriptions | $3,000 | $15 | 8.05% |
| Payment / Capital Cost (ends yr 15) | $18,036 | $90.18 | 48.37% |
| Average Depreciation / Year | $5,550 | $27.75 | 14.88% |
| Total fixed | $33,286 | $166.43 | 89.27% |
| Total budget | $37,286 | $186.43 | 100% |
Payment schedule (loan $157,250)
$1,503/mo - total interest $113,247 - total paid $270,497 - the Payment / Capital Cost line above is this payment annualized.
Fixed (blue) + variable (green) + major maintenance events (amber spikes) at 100 hrs/yr, with the aircraft's market value overlaid.
The line that actually matters — money out minus the airplane's residual value. Flat or falling = the type holds value.
Every scheduled event over 5 years at 100 hrs/yr — the "when does it hurt" list.
| Year | At hours | Event | Cost |
|---|---|---|---|
| Yr 1 | 100 | Battery pack capacity check | $200 |
| Yr 1 | 100 | Electric motor & inverter inspection (no engine service) | $150 |
| Yr 2 | 200 | Battery pack capacity check | $200 |
| Yr 2 | 200 | Electric motor & inverter inspection (no engine service) | $150 |
| Yr 3 | 300 | Battery pack capacity check | $200 |
| Yr 3 | 300 | Electric motor & inverter inspection (no engine service) | $150 |
| Yr 4 | 400 | Battery pack capacity check | $200 |
| Yr 4 | 400 | Electric motor & inverter inspection (no engine service) | $150 |
| Yr 5 | 500 | Battery pack capacity check | $200 |
| Yr 5 | 500 | Electric motor & inverter inspection (no engine service) | $150 |
| past 5-yr plan | 600 | Battery pack capacity check | $200 |
| past 5-yr plan | 700 | Battery pack capacity check | $200 |
| past 5-yr plan | 800 | Battery pack capacity check | $200 |
| past 5-yr plan | 900 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,000 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,100 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,200 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,300 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,400 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,500 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,600 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,700 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,800 | Battery pack capacity check | $200 |
| past 5-yr plan | 1,900 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,000 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,100 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,200 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,300 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,400 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,500 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,600 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,700 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,800 | Battery pack capacity check | $200 |
| past 5-yr plan | 2,900 | Battery pack capacity check | $200 |
| past 5-yr plan | 3,000 | Battery pack capacity check | $200 |
Fixed costs amortize as hours rise — this is why owners say "fly it more, it gets cheaper".
| Hrs/yr | Fixed/hr | Variable/hr | All-in/hr |
|---|---|---|---|
| 20 | $318 | $12 | $330 |
| 50 | $127 | $12 | $139 |
| 100 | $64 | $12 | $76 |
| 150 | $42 | $12 | $54 |
| 200 | $32 | $12 | $44 |
| 300 | $21 | $12 | $33 |
Down $27,750 · loan $157,250 · $1,503/mo · total interest $113,247
What actually moves a deal, and by how much. Use during the pre-buy.
Engine mid-time (60-85% of TBO)
−$5k–15k vs low-timePrice the pro-rated overhaul reserve; a fresh engine is worth a premium, a run-out engine is a -$20k+ event.
No logbooks / partial logs
−20–35% of valueMissing logs make the aircraft unairworthy to prove — many banks won't finance, many insurers won't quote.
Damage history (repaired)
−15–30%Get the 337s and repair records; a well-documented major repair is acceptable, an undocumented one is a walk-away.
Corrosion (found in pre-buy)
−$3k–20k+Engine corrosion from sitting kills the cylinders; airframe corrosion in carry-throughs is a big fix.
Expired annual
−$500–1,500Fresh inspection + whatever it finds — always assume the inspection finds items.
Fresh annual + fresh engine + good avionics
+10–20% over bookAnd worth it — the "buy the best and cry once" strategy is usually the cheapest path.
Avionics (steam vs glass)
−$15k–60kA steam-panel 172 needs a $25k+ avionics refit to be IFR-modern — price the panel into the deal.
Hangared vs outside
±$2k–8k of deferred itemsOutside-stored aircraft show corrosion everywhere the hangared twin doesn't.
Every source behind this dossier. The aircraft's own POH/MM always takes precedence.
FAA · TCDS database — search by make/model for the certified engine models and ratings
FAA · Search the model (e.g. "Cessna 172") for mandatory recurring inspections
eCFR · The regulatory basis for the inspection interval on every US aircraft