Acquisition deep dive
Turboprop · Turbine · 9 seats · 175 kt cruise · market ≈ $2,400,000 (trend +5%/yr)
Defaults compiled from the manuals and owner surveys. Change anything — everything recomputes.
Annual budget
$424,840
Monthly budget (16.67 hrs)
$35,403
Total hourly cost
$2124.2/hr
| Line | Annual | Per hour | % |
|---|---|---|---|
| Annual variable | |||
| Fuel | $52,200 | $261 | 12.29% |
| Airframe Maintenance | $9,334 | $46.67 | 2.2% |
| Engine / APU Maintenance | $26,666 | $133.33 | 6.28% |
| Consumables & Misc | $3,000 | $15 | 0.71% |
| Unscheduled / Aging Reserve | $18,000 | $90 | 4.24% |
| Total variable | $109,200 | $546 | 25.7% |
| Annual fixed | |||
| Hangar | $4,500 | $22.5 | 1.06% |
| Insurance | $2,200 | $11 | 0.52% |
| Aircraft Misc & Subscriptions | $3,000 | $15 | 0.71% |
| Payment / Capital Cost (ends yr 15) | $233,940 | $1169.7 | 55.07% |
| Average Depreciation / Year | $72,000 | $360 | 16.95% |
| Total fixed | $315,640 | $1578.2 | 74.3% |
| Total budget | $424,840 | $2124.2 | 100% |
Payment schedule (loan $2,040,000)
$19,495/mo - total interest $1,469,154 - total paid $3,509,154 - the Payment / Capital Cost line above is this payment annualized.
Fixed (blue) + variable (green) + major maintenance events (amber spikes) at 100 hrs/yr, with the aircraft's market value overlaid.
The line that actually matters — money out minus the airplane's residual value. Flat or falling = the type holds value.
Every scheduled event over 5 years at 100 hrs/yr — the "when does it hurt" list.
| Year | At hours | Event | Cost |
|---|---|---|---|
| Yr 1 | 100 | Chip detector / oil analysis (S-OAP) | $150 |
| Yr 2 | 200 | Cargo pod structure inspection | $300 |
| Yr 2 | 200 | Chip detector / oil analysis (S-OAP) | $150 |
| Yr 3 | 300 | Chip detector / oil analysis (S-OAP) | $150 |
| Yr 4 | 400 | Cargo pod structure inspection | $300 |
| Yr 4 | 400 | Chip detector / oil analysis (S-OAP) | $150 |
| Yr 5 | 500 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 600 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 600 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 700 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 800 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 800 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 900 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,000 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 1,000 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,100 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,200 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 1,200 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,300 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,400 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 1,400 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,500 | Hot-section inspection (HSI) | $52,000 |
| past 5-yr plan | 1,500 | Major periodic inspection (MPI / per MM Chapter 5) | $34,000 |
| past 5-yr plan | 1,500 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,600 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 1,600 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,700 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,800 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 1,800 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 1,900 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,000 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 2,000 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,100 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,200 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 2,200 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,300 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,400 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 2,400 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,500 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,600 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 2,600 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,700 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,800 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 2,800 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 2,900 | Chip detector / oil analysis (S-OAP) | $150 |
| past 5-yr plan | 3,000 | Engine overhaul (Pratt & Whitney Canada PT6A-114A) | $400,000 |
| past 5-yr plan | 3,000 | Hot-section inspection (HSI) | $52,000 |
| past 5-yr plan | 3,000 | Major periodic inspection (MPI / per MM Chapter 5) | $34,000 |
| past 5-yr plan | 3,000 | Propeller overhaul (McCauley/Hartzell) | $24,000 |
| past 5-yr plan | 3,000 | Cargo pod structure inspection | $300 |
| past 5-yr plan | 3,000 | Chip detector / oil analysis (S-OAP) | $150 |
Fixed costs amortize as hours rise — this is why owners say "fly it more, it gets cheaper".
| Hrs/yr | Fixed/hr | Variable/hr | All-in/hr |
|---|---|---|---|
| 20 | $3025 | $589 | $3614 |
| 50 | $1210 | $589 | $1799 |
| 100 | $605 | $589 | $1194 |
| 150 | $403 | $589 | $992 |
| 200 | $303 | $589 | $892 |
| 300 | $202 | $589 | $791 |
Down $360,000 · loan $2,040,000 · $19,495/mo · total interest $1,469,154
What actually moves a deal, and by how much. Use during the pre-buy.
Engine mid-time (60-85% of TBO)
−$5k–15k vs low-timePrice the pro-rated overhaul reserve; a fresh engine is worth a premium, a run-out engine is a -$20k+ event.
No logbooks / partial logs
−20–35% of valueMissing logs make the aircraft unairworthy to prove — many banks won't finance, many insurers won't quote.
Damage history (repaired)
−15–30%Get the 337s and repair records; a well-documented major repair is acceptable, an undocumented one is a walk-away.
Corrosion (found in pre-buy)
−$3k–20k+Engine corrosion from sitting kills the cylinders; airframe corrosion in carry-throughs is a big fix.
Expired annual
−$500–1,500Fresh inspection + whatever it finds — always assume the inspection finds items.
Fresh annual + fresh engine + good avionics
+10–20% over bookAnd worth it — the "buy the best and cry once" strategy is usually the cheapest path.
Avionics (steam vs glass)
−$15k–60kA steam-panel 172 needs a $25k+ avionics refit to be IFR-modern — price the panel into the deal.
Hangared vs outside
±$2k–8k of deferred itemsOutside-stored aircraft show corrosion everywhere the hangared twin doesn't.
Every source behind this dossier. The aircraft's own POH/MM always takes precedence.
FAA · TCDS database — search by make/model for the certified engine models and ratings
FAA · Search the model (e.g. "Cessna 172") for mandatory recurring inspections
eCFR · The regulatory basis for the inspection interval on every US aircraft